Axora
AXORACONSTRUCTION LTD
Get a quote
Mesh reinforcement laid over DPM ready for pour in the stable courtyard at South Ormsby Estate, with the Georgian brick hall behind
Civil Engineering · Groundworks · Teesside · Yorkshire · Lincolnshire

We build
groundworks
that hold.

Axora Construction is a civil engineering and groundworks contractor based in Eaglescliffe, Teesside, with a site team out of Selby. We dig, drain, pour and finish for main contractors, and we work Teesside, Yorkshire and Lincolnshire. Packages up to £1m.

Current contract1 site
South Ormsby Estate
Louth, Lincolnshire · Simpson (York) Ltd
On site
RC slab constructionAdoptable drainageEarthworks
Running into 2027
Sept 2025incorporated · trading ever since◆£1mfirst-year turnover forecast, just under◆1client · one contract · South Ormsby, Lincolnshire◆0RIDDORs since incorporation◆£1mbiggest package we are set up for◆Sept 2025incorporated · trading ever since◆£1mfirst-year turnover forecast, just under◆1client · one contract · South Ormsby, Lincolnshire◆0RIDDORs since incorporation◆£1mbiggest package we are set up for◆
What we do

Eight disciplines.
One crew on site.

We self-deliver groundworks, drainage, civils and surfacing with our own gang: the same faces from dig to handover, not an agency and not passed down a chain of subcontractors.

Drag, swipe or use the arrows
Finished concrete slab in the courtyard with an operative working on
01 / 08

Concrete

Ground-bearing and suspended slabs, retaining walls and hardstanding. Cast and finished by our own crew.

SlabsSuspendedRetainingFM2
Completed reinforced concrete pad foundations and ground beams inside a restored brick outbuilding
02 / 08

Substructures

Strip, trench-fill and pad foundations, pile caps, ground beams and specialist substructure elements.

FoundationsPile capsGround beamsRC
Deep benched excavation with a narrow pipe trench cut into the formation
03 / 08

Drainage

Foul, surface and combined drainage to the Water UK Design and Construction Guidance for S.104 adoption. Manholes, deep drainage, SuDS and attenuation.

S.104SuDSAttenuationManholes
Blue water ducts and black ducts running into the building under blue and yellow marker tape
04 / 08

Ducting

Multi-utility service trenches, HV and LV cable ducting, comms ducting and gas and water laterals, reinstated to tolerance.

Multi-utilityHV & LVCommsLaterals
Binder course laid up to a concrete kerb race on a new estate road
05 / 08

Highways

S.278 highway works, S.38 adoptable estate roads and S.50 street works, built to the adopting authority's specification.

S.278S.38S.50Adoptable
Reduced-level excavation running along the flank of the Georgian brick hall
06 / 08

Earthworks

Bulk excavation, muck-away, site clearance, reinforced earth and embankments, cut and filled to programme.

Bulk digMuckawayClearanceEmbankments
Completed reclaimed brick paving in the walled heritage courtyard
07 / 08

Surfacing

Macadam surfacing, block paving, flagging and resin-bound surfacing, laid to falls, line and level.

MacadamBlock pavingFlaggingResin
Completed circular stone hardstanding in mature parkland
08 / 08

Landscaping

Turfing, topsoil, planting, fencing and boundary works to close a job out properly.

TurfingTopsoilPlantingFencing
Recent work

South Ormsby Estate.
Lincolnshire.

RC slab construction for a historic stable courtyard conversion, combined with drainage works and associated earthworks for main contractor Simpson (York) Ltd.

Drone view looking straight down on courtyard groundworks within the heritage buildings
Stable courtyard · on site
Case study

RC slab, drainage and earthworks for a heritage conversion.

Principal groundworks package for the South Ormsby Estate stable courtyard conversion in Lincolnshire. We are on site now, working direct to main contractor Simpson (York) Ltd, with our own gang on the RC slab, the adoptable drainage and the earthworks.

Main contractor
Simpson (York) Ltd
Location
Lincolnshire
Scope
RC slab · drainage · earthworks
The Axora difference

Every diary, permit and pour
runs on Axora Forge.

The Axora Forge site management system is software we built and run in-house. Site diaries, RAMS, permits, plant inspections and timesheets, all signed off the same day.

Why it matters to you

Real-time site truth.
No paperwork drift.

When a permit is issued, a pour goes down or a near-miss is logged, you see it the same hour, not at the next progress meeting. Auditable, time-stamped, signed.

  • ⬤Site diary written on site and issued to you the same day.
  • ⬤RAMS, COSHH and permits signed digitally on site.
  • ⬤Plant inspections and HAVS exposures tracked per operative.
  • ⬤Variations and valuations priced off the agreed measure, with the rate build-up shown.
Request a demo
AXORAFORGEforge.axoraconstructionltd.co.uk / sites / SO-101
RAMSPlant
Temp
9°C
Wind
14mph
Rain
2.1mm
Crew
8
06:45
Crew inducted, 8 ops on siteSouth Ormsby · TBT: silica dust
C.WALL
08:10
Pour · 42 m³ · C32/40Slump 90 mm · cube ref SO-101-14
T.ELLIS
10:22
Permit-to-dig issued · RUN-07CAT scan + GPR · NW corner
SITE SUP
13:05
Near-miss reported: stacked palletsAction: relocate · close 14:30
C.WALL
15:48
DN450 lay rate · 38 m installedMH-07 to MH-09 · benched and tested
T.ELLIS
£1m
First-year turnoverjust under, forecast to 30 September 2026
0
RIDDORssince incorporation, September 2025
£10m
Public liabilityQBE · employers liability also £10m
1
ClientSimpson (York) Ltd, since day one
How we work

Five steps from
walkover to handover.

Boring, predictable, on time. The only surprises we like are the ones we find in the ground.

STEP 01

Brief & walkover

We meet you on site or over a drawing-share. Scope, programme and risks captured first time.

STEP 02

Quote & method

Priced bill of quants, programme and outline RAMS, to a return date we agree when the enquiry lands. If we cannot meet yours, we say so up front.

STEP 03

Mobilise

Welfare, hoarding, traffic management and induction pack live before week one.

STEP 04

Build & report

Daily Axora site diary, weekly progress meetings, no surprises at month-end.

STEP 05

Hand over

As-builts, O&M manual and drainage CCTV pack as one set. We then see out whatever defects period the contract sets.

CHAS Elite
Constructionline Gold
SSIP
Social Value Accredited
Get in touch

Tender us in.
We'll be honest about whether we're the right fit.

Drop the basics in and we'll come back with a sensible next step, usually a 30-minute call and a site walkover.

Eaglescliffe, Teesside
Mon-Fri 07:00 - 17:30

Fields marked are required.

Scope (select any that apply)
We reply within 1 working day.